Denka® was brought online at Nestlé Waters’ Ma’an facility in Jordan on 1 July 2026. Savings were measured on specific energy consumption (kWh per m³ of water produced) against a weather- and degradation-adjusted baseline, through the two hottest months of the year.
Results
- 14.7% average savings in July and August 2026
- 134,693 kWh avoided in two months
- 20.8% reduction in August alone, as the system reached full integration
- Specific energy consumption fell to 45.46 kWh/m³ in August — better than the plant’s 2025 level