Time-of-use tariffs in Jordan: turning the electricity bill into a strategy
Jordan’s time-of-use tariffs charge industry far more at the evening peak. Plants that combine load shifting with efficiency can cut costs twice — once on the price, once on the volume.
Jordan has been restructuring electricity prices for productive sectors in line with the Economic Modernisation Vision, one of whose stated objectives is lower electricity prices for economic activity. A central tool is the time-of-use tariff: lower rates off-peak, higher rates at the evening peak.
How big is the difference?
Reported peak-period rates (17:00–23:00) give a sense of the stakes: around 226 fils/kWh for extractive industry, 130 fils/kWh for large industry and 79 fils/kWh for medium industry. The Energy Minister has argued that the tariff structure is designed to reward plants that shift load, projecting very large savings for industry if a quarter of loads moved to low-demand periods.
Two levers, not one
Most companies hear “time-of-use” and think only about scheduling. That is the first lever: price per kWh. The second is how many kWh you need at all. They compound:
- Shift: move batch processes, water pumping, charging and pre-cooling out of the peak window where the process allows.
- Cut: reduce losses on the loads that cannot move — motors, compressors, chillers — through power-quality treatment and maintenance.
- Contract: review the tariff category and maximum demand against your real load profile.
Start with data
A credible programme starts with 12 months of bills, production records and, ideally, interval meter data. From there, OCCASIO® builds a baseline, models the tariff impact of different schedules and identifies efficiency measures with measurable payback — such as passive power-quality treatment from our sister company Denka®, which has delivered verified savings at Jordanian sites including Dar Al Dawaa and HOMAIN.
The bill is not a fixed cost. Ask OCCASIO® for a tariff and efficiency review.