Denka® plates were installed in the electrical panels of Jaber Mall’s Al Hashmi Al Shamali branch in Amman on 1 January 2026. The first five months were compared with 2025, adjusted for roughly 10% growth in activity and for new air-conditioning load added in 2025.
Results
- 16.8% savings over January–May 2026 (interim result)
- 40,494 kWh avoided in five months
- Monitoring continues over a full 12 months