PSF’s preform and film divisions in Jeddah run on 13 transformers of 1,000 kVA. Before installation, consumption had drifted 14.6% above 2025 under Red Sea heat and humidity. Denka® was commissioned for September 2026, when production also rose 7.5%.
Results
- 9.2% whole-facility savings in September 2026
- 192,837 kWh avoided in a single month
- 18.8% direct drop on the five most responsive film and preform sub-meters
- Energy per kg fell from 1.927 to 1.876 kWh while output grew